Glen-L Squirt Project 2003 - 2005

Last Update: 07 June 2005

Email:  david@sum-it.biz

 

Best viewed at

1024 x 768 resolution

Most Recent Photos are shown first

Calm evening at the lake  [02 May 2005]
Windshield bedded into brackets with black sikaflex  [23 Jan 2005]
  
Front views after 6mm laminated windshield installed  [23 Jan 2005]
 
Rear view, Side view  [23 Jan 2005]
 
Fuel Tank Cradle, Motor Switch detail, Steering cable vent  [23 Jan 2005]
First launch, fully completed  [16 October 2004]
After Final Painting with white Toplac (no varnish yet) [21 August 2004]
Stainless Steel Motor Bracket [21 August 2004]
Primed by roller with 3 coats of International Prekote [09 August 2004]
Deck before epoxy / Deck After Epoxy [02 August 2004]
Rear view showing smart tabs [22 July 2004]
Mahogany & Maple decking / Trailer side view [22 July 2004]
First Launch!! [13 June 2004]
Applying glass cloth [03 June 2004]
Before and After 1st epoxy seal coat  [29 May 2004]
More Trailer Photos  [09 May 2004]
Trailer Frame made from 2"x2" box  [09 May 2004]
Interior after 2 coats of garage floor paint  [07 May 2004]
[Click to enlarge][Click to enlarge]
Interior after 3 coats of Epoxy [24 April 2004]
[Click to enlarge][Click to enlarge]
Deck Framing
[Click to enlarge][Click to enlarge]
Deck Framing
[Click to enlarge][Click to enlarge]
Side and Bottom Planking
[Click to enlarge][Click to enlarge]
Faired Hull
[Click to enlarge][Click to enlarge]
Faired Hull
[Click to enlarge][Click to enlarge]
Faired Hull
[Click to enlarge] [Click to enlarge][Click to enlarge]
Checking the chine "twist" Trial Fitting the chine
[Click to enlarge] [Click to enlarge]
Gluing the sheer/chine scarf joints Keel bolted to stem and glued in place
[Click to enlarge]
Frames screwed temporarily to the building form


member of the Boatbuilding Ring Previous Site Random Site List Sites Next Site
Free Website Counters
Free Website Counters